3. Add a dehumidification condensation waste heat recovery system to improve the dehumidification efficiency of the runner and reduce the regeneration heating temperature.
4. The upper and lower areas of the regeneration area and the treatment area are set up to facilitate maintenance and eliminate wind leakage.
5. Easy to fix both sides of the feet, and the unit can be installed along the wall; reduce the use of the unit on the effective indoor area.